Storypost | 2008.10.05


The flooring has begun. I don't have any shots other than the above.

However, rest assured Jon and Dave have it down to a science. The hallway leading to the master bedroom is done. We'll probably cover a lot of ground tomorrow, so to speak.

Bobby mowed down the remaining junipers, I sealed and tested the shower, and everyone plus Connie finished the fireplace.


And we managed to squeeze in some cards/Chop Stix/boba...


... and a little pool shenanigans.

Pool deck jump Pool deck jump



Related - internal

Some posts from this site with similar content.

Post
2008.10.05

Entryway floor

Turning the corner gracefully on the hallway floor proved challenging. So we knocked off the entryway area pretty quick (two or three hours). It went well with Jon on the nail gun, Curt on precision sawing, and Connie and Krista picking planks. The l...
Post
2008.09.11

Last of the painting, start of the flooring

The hallway, stairway, and unnamed area adjacent to the kitchen is ready to be primed. And that will be the last of it.
Post
2008.09.04

Renovation limbo

Another day, another few photos. The kitchen is now cleaned up, real renovations (cabinetry, counters, sink, etc.) are planned for a later date. But tonight was the first real meal thanks to finally having a selection of appliances. That would be chi...